Project item
|
Project Need |
Homeowner Responsibilities
|
FLOOR COVERING (Internal piers only)
|
When internal pier placement is required, we cut through the floor or tunnel underneath the house/building. We will pull back carpet, but will not stretch/seam/tack/clean repair, replace or fix floor-coverings.
|
Homeowners with special tile or wood floor should consider the tunnel option for internal piers. Otherwise, floor covering in areas with internal piering will need to be replaced, at the owner?s expense.
|
FURNITURE FIXTURES/DECOR (Internal piers only)
|
Digging in the dirt is very messy work and we want to keep your valuables safe.
|
Clear rooms of all furniture, fixtures and appliances in areas requiring internal pier placement (or arrange for tunneling).
|
IT?S A DIRTY, MESSY JOB (Internal piers only)
|
Digging in the dirt is messy work. When internal piers are done, dirt is hauled up through a hole in the floor. It stays piled indoors, until the work is completed. Dirt, mud and concrete splatter is part of the job, but we try to protect outlying floors/furnishings as best as possible.
|
It is recommended that homeowners relocate to a hotel and friend?s house during this phase of the project. You may want to have someone do a thorough cleaning throughout once the project is complete.
|
THE LEVELING (ALL JOBS)
|
After the piers are placed, the structure is leveled. A supervisor will direct the leveling. We will need access to the inside of the house.
|
Some homeowners leave a back door open or provide a key to a trusted neighbor or friend.
|
EXPECTATIONS (ALL JOBS)
|
Things shift around when the foundation is lifted and leveled out. This simply cannot be helped. Your house may have been sitting on water pipes that crack when lifted. The new alignment may cause cracking of your walls and windows. Doors may shift. Roof tiles may pull away.
|
Please review the contract and warranty section. T You may need to make plumbing repairs T You may need to patch and repaint walls and ceilings. T You may need to readjust doors for smooth alignment.
|
WHEN WE?RE DONE
|
We will patch access penetration holes. However, if you prefer we will leave any hole open until plumbing repairs are made.
|
Let concrete patch dry 48 hours before applying floor covering material.
|
DIRT REMOVAL
|
We will arrange for the removal of excess dirt and debris.
|
Please bear with us. Temporarily, dirt and debris will be piled in the driveway pending pickup. Pickup will be made as soon as possible at the completion of the job, to minimize any inconvenience to the homeowner.
|
HYDROSTATIC TEST Residential ONLY
|
Whenever possible, we will perform a courtesy hydrostatic test on sewer lines located in the area of repair.
|
An industry standard 3-inch, residential ?T? clean out is required for the hydrostatic test. Unfortunately, we cannot perform the test without the standard clean out or if repairs have been done by others.
|
THE PAYMENT
|
We need to be paid for our work.
|
Please issue payment in full immediately upon completion of the project. Checks can be made payable to Arredondo Group.
|
THE WARRANTY
|
We will issue any warranties due to the homeowner when payment is and plumbing repairs are made.
|
Please let us know if you would like us to delay issuance of the initial warranty for the new owner. Further transfers of warranty can be made for a nominal fee.
|